Over the past 15 years, the principals of Gaseng Petroleum
have provided a multi disciplined engineering Design & Construct
service, specialising in the LPG and petrochemical industries.
Projects have been undertaken either by Gaseng Infrastructure
or associated entities.
This engineering work comes under the aegis of Gaseng Director
Ian Cessford. An engineer with over 20 years in the oil and
gas industry.
Recent projects included the following:
Christmas Island – New 2000mt diesel tank and associated
infrastructure.
Scope: Design, gain mandatory approvals,
materials expediting, construction supervision (including applying
Quality Assurance
to construction) and commissioning of a new 2000 mt
Diesel tank and associated pumping to facilitate pumping to
Power Station
at a 300m elevation and through a 1.6Km pipeline, instrumentation & controls.
Tank design was to British Standards (BS). Special bunding was
required because of site constraints. Project included automation
to suit remote pumping location and included fire protection
(fire fighting platforms & ring mains).
Christmas Island – Complete Refurbishment of 2 x
400 tonne petrol tanks at Rocky Point.
    
Bulk
solvents depot - Mobil Oil, Chipping Norton – Sydney.
Design and documentation of a Bulk Solvents Depot at Chipping
Norton in Sydney for Mobil Oil Ltd consisting of 11 tanks: 5
above ground (mounded) and 6 underground, associated pumps (truck
fill and drum fill pump sets), overhead pipe rack, 4 arm tank
truck till stand, 4 x 200 litre drum pallet and conveyor, semi
automated drum fill station, product blending tank, bunding,
hazardous area wiring and lighting. This project also incorporated
substantial programming of PC driven programmable Logic Controller
Systems and specification, procurement, installation and commissioning
of electrical and computing equipment and software.
LPG tank truck fast fill loading - Mobil refinery Port
Stanvac, S.A
Engineering design and preparation of documentation for procurement
for a semi- automated truck loading and unloading facility
at Mobil's refinery in Port Stanvac - South Australia.
The system encompassed 2 x loading bays with overhead loading
arms capable
of loading 3 x products; Automix, Propane and Iso Butane
and back loading Iso Butane. Package included loading
controls
(visual
display, operator punch-kilograms plus earthing and
loading arm park permissive). Scope included; the design
and programming
of PC driven Programmable Logic Controller Systems,
design and documentation, specifications for procurement,
installation and commissioning of civil, mechanical, electrical
and computing
equipment and software and fire protection design.
LPG bulk ship unloading and truck loading facility - Shell
Guam Inc. Guam.
Design and documentation of the bulk ship unloading and truck
loading facility for the Shell Company in Guam. This included
major design modifications and refurbishment of an existing
11.6 M dia. sphere, loading and unloading pump sets, truck loading
and unloading gantry, cylinder filling platform (covered platform
and 2 x platform scales) pipework, pipe supports and associated
civil works including control room and cylinder filling.
LPG bulk storage terminal and cylinder filling plant - Shell
Guam Inc. Saipan island, Micronesia.
Preparation of design engineering package and documentation
for a gas depot in Saipan (Micronesia) for Shell Guam Inc. This
facility provided for; ISO Container unloading into twin 20
tonne tank storage. Bobtail tanker loading from the storage
tanks at a loading gantry (using same unloading / loading pump).
A cylinder filling facility and platform, pump, pipework. Fire
protection, light and power and controls.
Part of the fire protection of the depot included the conversion
of the Fuels Dept fire pump to automatic start and additional
pumps for specific fire water requirements.
|